top of page



Returning Plant and Equipment to Service After Prolonged Inactivity
Purpose of this Notice When plant, machinery and building services are left idle for extended periods, their condition can change in ways that are not immediately obvious. Moisture can accumulate, components may corrode or seize, lubricants can degrade, and control systems may become unstable. Restarting equipment without suitable preparation can therefore result in damage, service disruption or serious safety incidents. This advisory note outlines practical precautions to su


Engineering Equipment Inspection Frequencies – UK & Republic of Ireland
At Carn Engineering, we’re committed to delivering thorough and reliable inspection and testing services. This document outlines recommended inspection and examination frequencies for key categories of engineering equipment in accordance with United Kingdom and Republic of Ireland legislation.
bottom of page



